Description
Developed by Monty Roberts to help horses learn incrementally, this durable nylon lead rein features a soft cotton core, helping to protect the handlers hands while the flat design ensures a firm grip can be achieved by all hand sizes. The super strong nylon does not break down in dirt and moisture and the robust brass snap hook holds up well in even the harshest conditions.
Other suitable uses for a 3.65m lead:
- Gives a handler maneuvering room if a horse plays up.
- Gives plenty of length to wrap through a noseband as a suitable alternative to harsh chains.
- Can be used to create a quick foal handler (figure of eight).
Colours: Red only. Sizes: 12 foot (3.65m) in length.